Out with the Old.
Re-Frame Window openings for Larger Windows.
Exposing all the Framing.
Old Window Framing Torn Out.
New Framing in.
Installing Typar on Foundation.
Insulation and Vapour Barrier followed by Tuck Taping all seams and around Device Boxes.
Drywall Install.
Finish Work around New Windows.
Potlights installed to accent Fireplace.
Panel Cover Finished. (Open)
Panel Cover Finished. (Closed)